ENGINEER SIKANDER KHAN -- HAS ACCUMULATED
OVER 30 YEARS
EXPERIENCE AS A OPERATIONS AND MAINTENANCE ENGINEER, FOR
HVAC DUCT FABRICATION’S, CHILLER, FABRICATION OF OIL TANKS AND PIPELINES,
GENERATORS INSTALLATION’S, OPERATIONS, AND MAINTENANCE, LARGE FLEET CONTROLLER ESTIMATION, INSPECTION AND SURVEY --
Project Manager and COST CONSULTANT ENGINEER.
(ELECTRO-MECHANICAL)
EXPERIENCE
INCLUDES PREPARATION OF SHOP DRAWINGS,
BILL OF QUANTITIES, NEW
FABRICATION, INSTALLATION,
COMMISSIONING, MAINTENANCE AND
TROUBLE SHOOTING ON COMMERCIAL
AND INDUSTRIAL PROJECTS TO INCLUDE
ALL ELECTRICAL & MECHANICAL
SERVICES –WATER LINES, WASTE - WATER
LINES, AND CHILLED WATER - LINES, LIQUID GAS STATION’S &
GAS - LINES, STEAM LINES AND INDUSTRIAL PROCESS
PIPING (INCLUDES PLASTIC
AND GLASS LINES FOR CHEMICALS, ACIDS
& LIQUID NITROGEN). RESPONSIBLE FOR ALL CIVIL WORKS.
OTHER
RESPONSIBILITIES..
Ø ABILITY TO ASSESS SPECIALIZED DISCIPLINE
(ELECTROMECHANICAL) MATERIALS AND EQUIPMENT'S IN HIGH TECH LARGE CONSTRUCTION
PROJECTS – OVER VALUE OF SR:150 M.
Ø KNOWLEDGE AND SKILLS TO GUIDE AND OVERSEE THE WORK OF
ESTIMATION ENGINEERS IN BOTH ELECTRO-MECHANICAL DISCIPLINES.
Ø ABILITY TO FORMULATE A PRICING STRUCTURE AS STANDARD
REFERENCE FOR COMPARISON WITH PROPOSALS FROM SUB-CONTRACTORS.
Ø PREPARE ANNUAL BUDGETS AND PERIODIC REPORTS ON
OPERATING COSTS AND PURCHASE.
Ø PURCHASE / LEASE OF PLANTS, AND HEAVY EQUIPMENT'S.
Ø COMMUNICATION AND NEGOTIATION SKILLS.
Ø KNOWLEDGE OF RELEVANT INTERNATIONAL CODES, STANDARDS AND SPECIFICATION WITH THE ABILITY
TO:
o
CONTROL QUALITY
OF WORKS.
o
CONTROL PROJECT
BUDGET.
o
CONTROL MATERIAL
/ STORES.
Able to handle independent
- projects for:
1. Construction Cost
estimating.
2. Construction cost
management.
3. Bid Negotiations.
4. Project
Management.
5. Property
replacement cost valuations.
6. On-Site cost
Management
7. Assistance with
contractual claims.
8. Preparation of
bills of quantities.
9. Bill of Quantities
- reviews.
10. Technical
proposals.
11. Development of
Planned maintenance programme for E & M.
12. Operations and Maintenance –
Industrial Projects.
REDUCED STAFF BY 31% AND CUT OPERATING COSTS BY 12%
WHILE INCRESING PRODUCTIVITY BY 60%.