ENGINEER SIKANDER KHAN -- HAS ACCUMULATED
OVER 30 YEARS
EXPERIENCE AS A OPERATIONS AND MAINTENANCE ENGINEER, FOR
HVAC DUCT FABRICATION’S, CHILLER, FABRICATION OF OIL TANKS AND PIPELINES,
GENERATORS INSTALLATION’S, OPERATIONS, AND MAINTENANCE, LARGE FLEET CONTROLLER ESTIMATION, INSPECTION AND SURVEY --
Project Manager and COST CONSULTANT ENGINEER.
(ELECTRO-MECHANICAL)
EXPERIENCE
INCLUDES PREPARATION OF SHOP DRAWINGS,
BILL OF QUANTITIES, NEW
FABRICATION, INSTALLATION,
COMMISSIONING, MAINTENANCE AND
TROUBLE SHOOTING ON COMMERCIAL
AND INDUSTRIAL PROJECTS TO INCLUDE
ALL ELECTRICAL & MECHANICAL
SERVICES –WATER LINES, WASTE - WATER
LINES, AND CHILLED WATER - LINES, LIQUID GAS STATION’S &
GAS - LINES, STEAM LINES AND INDUSTRIAL PROCESS
PIPING (INCLUDES PLASTIC
AND GLASS LINES FOR CHEMICALS, ACIDS
& LIQUID NITROGEN). RESPONSIBLE FOR ALL CIVIL WORKS.
OTHER
RESPONSIBILITIES..
Ø ABILITY TO ASSESS SPECIALIZED DISCIPLINE
(ELECTROMECHANICAL) MATERIALS AND EQUIPMENT'S IN HIGH TECH LARGE CONSTRUCTION
PROJECTS – OVER VALUE OF SR:150 M.
Ø KNOWLEDGE AND SKILLS TO GUIDE AND OVERSEE THE WORK OF
ESTIMATION ENGINEERS IN BOTH ELECTRO-MECHANICAL DISCIPLINES.
Ø ABILITY TO FORMULATE A PRICING STRUCTURE AS STANDARD
REFERENCE FOR COMPARISON WITH PROPOSALS FROM SUB-CONTRACTORS.
Ø PREPARE ANNUAL BUDGETS AND PERIODIC REPORTS ON
OPERATING COSTS AND PURCHASE.
Ø PURCHASE / LEASE OF PLANTS, AND HEAVY EQUIPMENT'S.
Ø COMMUNICATION AND NEGOTIATION SKILLS.
Ø KNOWLEDGE OF RELEVANT INTERNATIONAL CODES, STANDARDS AND SPECIFICATION WITH THE ABILITY
TO:
o
CONTROL QUALITY
OF WORKS.
o
CONTROL PROJECT
BUDGET.
o
CONTROL MATERIAL
/ STORES.
Able to handle independent
- projects for:
1. Construction Cost
estimating.
2. Construction cost
management.
3. Bid Negotiations.
4. Project
Management.
5. Property
replacement cost valuations.
6. On-Site cost
Management
7. Assistance with
contractual claims.
8. Preparation of
bills of quantities.
9. Bill of Quantities
- reviews.
10. Technical
proposals.
11. Development of
Planned maintenance programme for E & M.
12. Operations and Maintenance –
Industrial Projects.
REDUCED STAFF BY 31% AND CUT OPERATING COSTS BY 12%
WHILE INCRESING PRODUCTIVITY BY 60%.
1 comment:
If you had financial problems, then it is time for you to smile. You only need to contact Mr. Benjamin with the amount you wish to borrow at the low rate of 2% ROI and the payment period that suits you and you will have your loan within three working days. I just benefited for the sixth time from a loan of 700 thousand dollars for a period of 180 months with the possibility of paying before the expiration date. Mr Benjamin has been helping me with the loan.Make contact with him and you will see that he is a very honest man with a good heart.His email is 247officedept@gmail.com and his WhatApp phone number is + 1-989-394-3740 .
Post a Comment